Header image
4827 South Conway Road * Orlando, Florida 32812
 
 

Shenandoah Elementary School
2008-2009 School Year

WE ARE NOT YET OPEN TO THE PUBLIC.

The construction of our new building with our Administrative Offices, classrooms, Media Center, and Computer Lab is not complete yet. Renovation to the current building also continues. New sound abatement windows and sound insulation are being added to every clasroom. The South Wing of the building where the old Computer Lab, the old Media Center, and the old Administrative Offices were located is being converted into new classrooms and office space. Several classrooms on the first and second floors in the South Wing are receiving a complete overhaul with new wallboard, flooring, lighting, audio and video capabilities, and new computer equipment.

You are going to be amazed when you see the completed building!

Below are the most recent photos of the new construction project.

A worker controls the machine that sprays the pavement markings for the staff aprking lot. (Taken August 4)

 

The new bike racks. (Taken August 4)

 

The new Media Center. The checkout desk is on the right side of the photo and the computer section is by the white board in the distance. A motorized projection screen is mounted in the ceiling just above the white board. (Taken August 4)

 

The new digital video cameras, teleprompter, anchor desk, and editing desk in the Closed Circuit Television Production Room. (Taken August 4)

 

Paving of the bus and daycare van loop and the staff parking area. All of the newly paved areas will have the stripes painted soon. (Taken August 1)

 

Workers put down sod along the front of the new building. Our instant lawn now surrounds the new building. (Taken July 31)

 

The new covered walkway leading from the car rider loop to the East entrance. (Taken July 28)

 

Beautiful landscaping is being added to the new building. Magnolia trees, oak trees, and crape myrtle trees have been planted. (Taken July 28)

 

This photo shows the old entrance to the school. This will be the new bus rider and daycare van dropoff loop and the staff parking lot. This area is currently being prepared for paving. (Taken July 28)

 

Paving the driveways and parking lots began Monday, July 14. This section is in the front of the school by Conway Road.

 

Rollin'. Rollin'. Rollin'...

 

The crew is making progress. This photo was taken Tuesday, July 15 and paving will continue today.

 

The new front entrance to the school.

 

Our new flower box.

 

Workers raise our new flagpole.

 

Our new administrative wing. Our new Media Center is on the far left side of the building. Our new Computer Lab and Art Room are down farther to the left. In the foreground, workers are installing pipes for the irrigation system.

 

The old entrance to the school and our new Art Room on the right side of the picture. A new sidewalk has just been poured where the orange cones are located. This walkway continues off to the right and leads to the new Media Center.

 

Workers installing pipes for the irrigation system near the section of the new building where ten classroom are located. Forms for a new sidewalk are also in place. In the distance is the South Wing of the school where renovation work is being done to modernize the classrooms.

 

The view from the car loop sidewalk with the pavilion and the playground in the distance.. What's missing? Portables 10 through 21 have been taken off our campus.

 

A new walkway has been poured leading from the car rider loop to the east entrance of the school. A canopy will run the entire length of the walkway. A new bike rack will soon be installed near the pavilion.

 

The new lobby and the doors leading to the Reception area!

 

Our new Reception Desk and waiting area!

 

Here's an aerial photo of how the school looked many months ago:

..........................................................................................................................................................

2007-2008 Construction News Archives

Shenandoah Moving Committee Construction News Update

On Friday, January 18, many of the staff got the very first guided tour of the two new buildings currently under construction. They got to see the new administrative offices, the Media Center, the Computer Lab, and the 10 new classrooms.

Take a look at these photos from the tour!

 

The new front entrance to the school on South Conway Road. Administrative offices, the new Media Center, Computer Lab and Art classroom will be in the one-story section of the building to the left. We'll have 10 new classrooms in the two-story section on the right.

 

A view of the new two-story section of new classrooms and the hallway leading to the current building.

 

Our new front entrance to the school and the doorway leading in to the front office.

 

The doorway leading to the front office, the reception desk, and administrative offices.

 

Our principal, Mrs. Vitale, in her new office.

 

Our curriculum resource teacher, Mrs. Peters, in her new office.

 

The main entrance to our new Media Center. There will be glass blocks in the curved section of the wall.

 

Our new Computer Lab will be next to the Media Center.

 

The first floor hallway in the new two-story section of new classroom space.

 

One of our 10 new classrooms.

 

The balcony on the second floor of the new classroom space overlooking the main entrance foyer.